Typical scope
A French drain and yard drainage project in California should start with a written scope that separates the core job from optional upgrades. In scope for this guide: diagnosing runoff, laying out swales, catch basins, French drains, downspout extensions, solid or perforated pipe, gravel, fabric, discharge points, daylight outlets, sump tie-ins where allowed, backfill, and surface restoration. The contractor should also define dust control, protection of existing finishes, work hours, debris removal, daily site cleanup, product allowances, and who communicates inspection dates. This is the practical middle of the market: more than a single repair visit, but less than a custom whole-house reconstruction.
Out of scope unless the proposal says otherwise: foundation structural repair, basement interior waterproofing, sewer work, municipal storm connection, retaining walls, major grading, irrigation redesign, and landscaping beyond disturbed areas unless included. Those items can be legitimate, but they change risk, schedule, permits, and the trades required. The safest contract names the prime contractor, each licensed trade, the products or allowances, payment milestones, and the conditions that trigger a written change order. California licenses all contractors performing work of $500 or more (including labor and materials) through the Contractors State License Board (CSLB). The CSLB issues Class A (general engineering), Class B (general building), Class B-2 (residential remodeling), and 40+ C-classification specialty licenses. For this project, relevant credential checks commonly point to: California Contractors State License Board (CSLB) — Class B General Building; California Contractors State License Board (CSLB) — C-36 Plumbing.
State-specific cost range
The state-content-2026-06 costBand for California lists General contractor remodel at $8,000 low, $45,000 typical, and $150,000 high. Drainage is priced below a remodel but rises with trench length, depth, pipe type, gravel volume, fabric, basins, discharge distance, machine access, soil disposal, and restoration. After that project adjustment, a planning range for this French drain and yard drainage project is $1,450 low, $9,900 typical, and $30,000 high.
Use those figures as a budget screen, not a quote. The low end assumes standard access, ordinary finishes, no major hidden damage, and a clean permit path. The high end reflects premium materials, difficult access, older homes, multiple inspections, structural or utility coordination, and change orders discovered after opening walls, roofs, or equipment spaces. For bid comparison, ask each contractor to separate labor, materials, permit fees, allowances, disposal, access assumptions, and change-order rates so a low headline price does not hide missing scope. For larger scopes, ask whether the bid assumes owner-supplied products, occupied-home protection, temporary utilities, final cleanup, disposal, and return trips after inspections. Confirm mobilization, warranty exclusions, sales tax assumptions, and documentation responsibilities separately for every bid before signing.
Permits required
Drainage work may need permits when discharge reaches a storm system, right-of-way, wetlands, slopes, easements, or neighboring properties. Some cities restrict sump and downspout connections. The state licensing source matters because a contractor license or registration is not the same thing as a project permit. California licenses all contractors performing work of $500 or more (including labor and materials) through the Contractors State License Board (CSLB). The CSLB issues Class A (general engineering), Class B (general building), Class B-2 (residential remodeling), and 40+ C-classification specialty licenses. Home Improvement Salespeople must also register. The project-specific licensing notes in the seed say: required at or above $500 through California Contractors State License Board (CSLB) — Class B General Building; Required for any project of $500 or more (combined labor + materials). required at or above $500 through California CSLB — Home Improvement Salesperson registration; Door-to-door / in-home sales of home improvement contracts require salesperson registration. required through California Contractors State License Board (CSLB) — C-36 Plumbing
For permits, verify the authority having jurisdiction before signing: city building department, county building department, consolidated permit office, or in some areas a separate utility or fire review. Ask who pulls the permit, whose license appears on it, whether owner-builder filing is allowed, which inspections occur before work is covered, and whether final approval is required before final payment. Keep the permit card, inspection approvals, and stamped plans or online permit record with the contract.
Timeline
Small drainage runs can take one to three days, while design review, utility marking, saturated soil, heavy equipment access, permits, and surface restoration can create a two- to six-week window. California schedules vary sharply by coast, valley, mountain, and desert microclimate. Plan around local energy-code review, wildfire or defensible-space details where applicable, and winter rain windows for exterior openings.
Because permit review is municipal rather than one statewide queue, treat the timeline as two tracks: approval and inspection scheduling on one side, materials and crew availability on the other. A contractor who gives a firm start date should also name the permit filing date, long-lead products, inspection hold points, and weather or utility conditions that can move the calendar.
5 questions to ask before hiring
What water source is being intercepted?
Ask whether the issue is roof runoff, surface flow, groundwater, sump discharge, neighbor runoff, irrigation, or poor grading.
Where will the water legally discharge?
A drain that moves water onto a sidewalk, street, neighbor, or unstable slope can create new liability.
What pipe and aggregate details are included?
Confirm perforated versus solid pipe, slope, cleanouts, fabric wrap, gravel size, basin locations, and outlet protection.
How are utilities and roots avoided?
Utility marking, hand digging, tree preservation, irrigation repair, and hardscape crossing should be addressed before trenching.
How will success be evaluated?
Ask for photos before backfill, as-built sketch, maintenance access, warranty, and what rainfall conditions the system is designed to handle.
Compare verified pros in California
Use this guide as a scope and permit checklist before requesting bids.