Project planner

Sewer / water service line planner

Plan the project with existing ProFix surfaces: the live plumber cost benchmark, exact permit-checker answer, license verification, material calculators, and quote links.

What it costs

$3,000 median; middle 50% $1,343-$7,000; n=225,182 permits; national scope. Estimate, not a quote.

Open the cost guide

Do I need a permit?

Yes

Call the permit office and utility before excavation; right-of-way rules may also apply.

Check your county

When to replace

50-year planning life (50 yr). InterNACHI lists ABS/PVC waste pipe at 50-80 years, below-ground cast-iron waste pipe at 50-60 years, and plastic/copper water lines at 50+ years.

InterNACHI Standard Estimated Life Expectancy Chart for Homes

Materials

No material calculator is attached to this project. Use the directory links below for hiring.

Verify the pro's license

Check the contractor's license or registration before signing, and make sure the license scope matches sewer / water service line.

Verify a license

Get quotes

Use the same project scope when comparing bids, including permit responsibility, materials, warranty, cleanup, and exclusions.

Emergency