What affects the price
- Number of baysPricing scales roughly linearly per Level 2 unit.
- Utility service upgradeOften the biggest line item; new transformer can be $10K-$50K.
- Trenching and conduitLong runs from electrical room to parking add cost.
- Smart-networkChargePoint, EV Connect, or SemaConnect subscription $25-$50/charger/month.
What's included
- Level 2 charger units
- Utility service upgrade (if needed)
- Trenching and conduit
- Network and billing setup
- OCILB Electrical contractor + commercial permit
When to call
Commercial sites should engage early — utility service upgrade is the long pole. Federal IRA Alternative Fuel Vehicle Refueling Property Credit covers 6% for commercial (or 30% if prevailing-wage rules are met).
Related questions
Should I get a DC fast charger instead?
DC fast chargers (50-350 kW) are 10x the cost of Level 2 but charge in 20-60 minutes. Worth it for highway-adjacent fueling or fleet ops; overkill for office or apartment workplace.
What Toledo neighbors actually paid
Real anonymous invoices submitted by Toledo homeowners. Updated as new contributions arrive.
Be the first to contribute! Your data point helps every Toledo homeowner who reads this page next.
+ Add what you paid (anonymous, 30 seconds) →
Get a real quote from a verified Toledo ev charger installer
Our directory shows transparent profiles with phone numbers, public reviews, and starting prices where available.
See EV Charger Installers →