What affects the price
- Existing service size100A to 200A is the standard EV-driven service upgrade.
- Service entranceMast and meter upgrade required if AEP/Toledo Edison spec changes.
- Permit + inspection$150-$400 in fees in most Ohio jurisdictions.
What's included
- 100A to 200A electrical service upgrade
- Meter coordination with utility
- Dedicated 240V EV circuit
- OCILB Electrical contractor
- Local electrical permit + final inspection
When to call
Get 3 quotes. Many 1960s-1980s Ohio homes have 100A service that is full and cannot support a 40A EV circuit without an electrical service upgrade. Confirm IRA credit eligibility on the EV charger portion.
Related questions
Why do I need an electrical service upgrade for an EV charger?
An EV charger needs a dedicated 40A circuit. If your 100A service is already 80% loaded (common in Ohio homes with electric AC, dryer, and range), there is no room for the new circuit — the electrical service must upgrade first.
What Toledo neighbors actually paid
Real anonymous invoices submitted by Toledo homeowners. Updated as new contributions arrive.
+ Add what you paid (anonymous, 30 seconds) →
Get a real quote from a verified Toledo ev charger installer
Our directory shows transparent profiles with phone numbers, public reviews, and starting prices where available.
See EV Charger Installers →